Mercedes-Benz EQE Operator's Manual page 397

Hide thumbs Also See for EQE:
Table of Contents

Advertisement

Take the ratchet out of the tire-change tool kit
#
and place it on the hexagon nut of the jack so
that the letters "AUF" are visible.
Position support
2
of jack
4
on jack sup-
#
port point 1.
Turn ratchet
3
clockwise until support
#
sits completely on jack support point
the base of the jack lies evenly on the ground.
Turn ratchet
3
until the tire is raised a maxi-
#
mum of 1.2 in (3 cm) from the ground.
Loosen and remove the wheel (
#
Removing a wheel
Requirements:
The vehicle is raised (
R
* NOTE Mercedes-AMG vehicles
Observe the notes in the Supplement.
#
You could otherwise fail to recognize
dangers.
When changing a wheel, avoid applying any force
to the brake discs, as this could impair the level of
comfort when braking.
* NOTE Damage to the wheels' plastic ele-
ments when changing a wheel
Plastic elements on wheels may be damaged
2
when removing and repositioning the wheel.
1
and
Do not raise the wheels by the plastic
#
elements when removing and reposition-
ing.
page 395).
/
* NOTE Damage to threading from dirt on
wheel bolts
Do not place wheel bolts in sand or on a
#
page 393).
/
dirty surface.
Unscrew the uppermost wheel bolt com-
#
pletely.
Screw alignment bolt
#
instead of the wheel bolt.
Wheels and tires 395
1
into the thread

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents