Figure 6-39. Menu For Making The Packet Connections; Figure 6-40. Menu For Connecting Packet Endpoints To Physical Port - ADTRAN ATLAS User Manual

Frame relay
Table of Contents

Advertisement

Step 3
Step 4
Step 5
Step 6
61200263L1-1.1
Configure the backup sublinks for use as backup, and tie them to the prima-
ry sublinks. See Figure 6-38 for the sublink configuration for the Boston
backup sublink. Follow similar steps to configure the Chicago and New
York sublinks.
Figure 6-38. Menu for Configuring Backup Sublink 1
Make the packet connections (see Figure 6-39).

Figure 6-39. Menu for Making the Packet Connections

Connect the packet endpoints to the physical port. The server connects to an
Nx56/64 module, and the frame relay network connects to a T1 port on the
controller (see Figure 6-40).

Figure 6-40. Menu for Connecting Packet Endpoints to Physical Port

Add the backup endpoints to the dial plan, as shown below (see also Figure
6-41). Refer to the ATLAS manual for details on dial plan configuration.
Backup Sublink
Chicago Backup
New York Backup
Boston Backup
ATLAS Frame Relay User Manual
Chapter 6. Frame Relay Configuration Examples
OutDial
Accept #
Number
(454) 111-9999 (444) 963-1111
(545) 222-8888 (444) 963-2222
(555) 333-7777 (444) 963-3333
6-15

Advertisement

Table of Contents
loading

Table of Contents