Wall Installation

Before starting to build the wall, keep the following points in mind:

Wall Installation Options

There are three main types of Clarity Matrix installations:
Clarity Matrix G3 LCD Video Wall System Installation Guide
020-1339-00H
• A structure that is plumb and flat will greatly reduce issues with mounting and
alignment of the Clarity Matrix system.
• Mounts are to be installed first - do not remove LCDs from their boxes until the
entire wall of brackets is installed, level and plumb.
• When hanging the mounting bracket and displays, start with the center and
work out and up.
• After each row of mounts and displays is built, check it for level and plumb.
• All mounts in a row should be level with the bracket next to it within ±0.1°. Each
mount should be square with the level surface by ±0.05°. Bracket wall planarity
should not exceed ±0.5mm. For larger walls, we recommend assuring that the
accumulation of tolerances will not prevent the proper positioning of the LCD
panels.
• It is important to check communication between the LCD modules as each row
is built. This will help minimize changes once the wall is fully installed.
• For optimal product performance, maintain components within temperature
specifications. Occasional temperatures out of specification are acceptable for a
short period of time.
• For touch walls, ensuring the wall is flat will greatly improve performance.
• Standard installation - mounted to a wall (see "Mounting Brackets to a Wall" on
page 80)
• Column floor stand - maximum of 2.2m (7ft) without additional support
• 2 x 2 free-standing mount (46L only)