Commissioning
5.1
Commissioning guidelines
Overview
Converter with control units CU240D-2
Operating Instructions, 07/2016, FW V4.7 SP6, A5E34262100B AD
1. Define the requirements to be
met by the drive for your
application.
(Page 82)
2. Restore the factory settings of
the inverter if necessary.
(Page 101)
3. Check if the factory setting of the
inverter is sufficient for your
application.
(Page 83)
4. Set the following for quick
commissioning of the drive:
– The closed-loop motor control
– The inputs and outputs
– The fieldbus interface
(Page 86)
5. Check if additional inverter
functions are required for the
application.
(Page 107)
6. If necessary, adapt the drive.
(Page 107)
7. Save your settings.
(Page 239)