Cornelius PRO ED FAST GATE Training Manual page 25

Table of Contents

Advertisement

Pro ED Fast Gate Training Manual
NOTE:THERE ARE ONLY TWO OFF CYCLE AGITATION TIME OPTIONS. IF THE CHUTE REFILL IS SET
FOR SMALL, MEDIUM, OR LARGE THE OFF CYCLE TIME WILL BE 30 MINUTES, THE ON
CYCLE TIME WILL BE (4) SECONDS. X-LARGE CHUTE REFILL SETTING WILL RESULT IN A 60
MINUTE OFF CYCLE AND A (4) SECOND ON CYCLE.
IntelliCarb Plumbing Diagram
- 21 -
© 2003, IMI Cornelius Inc.

Advertisement

Table of Contents
loading

Table of Contents