Preparation Before Using - Siemens 1MB115 Installation And Maintenance Manual

Table of Contents

Advertisement

Preparation before using

Good planning and preparation of machine applications are essential in
terms of keeping installation simple and avoiding errors, ensuring safe
operation, and allowing access to the machine for servicing and corrective
maintenance.
This chapter outlines what you need to consider when configuring your plant
in relation to this machine and the preparations you need to make before the
machine is delivered.
2.1
Observing the operating mode
Observe the machine's operating mode. Use a suitable control system to
prevent overspeeds, thus protecting the machine from damage.
2.2
Machines without final paint coating
For machines, which are only delivered with primer, you must paint them to
comply with the applicable guidelines for the specific application. The primer
alone does not provide adequate corrosion protection.
The paint applied must conform to the requirements to avoid electrostatic
charging, see EN 60079-0.
Please contact the Service Center for recommendations relating to the paint
finish.
2.3
Delivery
Checking the delivery for completeness
The drive systems are put together on an individual basis. When you take
receipt of the delivery, please check immediately whether the items delivered
are in accordance with the accompanying documents. Siemens will not
70
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

1mb515

Table of Contents