Flush water line into a bucket.
Install a hand shut-off valve in a
readily accessible location in the
adjacent cabinetry.
Hot water line installations:
Carefully route the hot water line
through the service hole in the side of
the cabinetry.
Route the hard wiring through the
service hole in the side of the cabinetry.
Tape to the floor to secure.
Remove the toe kick by unscrewing the
four screws.
Keep aside for re-assembly at the end of
the installation.
PUSH INTO CAVITY
1
2
3
4
Using a flat bladed screwdriver, turn to
raise the leveling feet. Level the rear,
outside legs first followed by the front
legs. Do not adjust the rear middle
leg yet.
Remove both screw covers before
partially pushing the product into the
cavity, pulling the hoses through as you
push to avoid crushing or twisting them.
Take care not to bend the legs.
Push the product from the outside
edges to avoid door damage. 
Check the product sits level within
the cavity.
To access the rear leg adjustment,
remove the four screws holding the toe
kick and mounting plate in place.
If required, the rear middle leg can be
adjusted from the front of the product
using a 6mm Allen key. 
Select desired spacer width and cut
to size. Remove adhesive and fit two
spacers to each side of the product.
Push the product into the cavity from
the outside edges taking care not to
damage the electrical cable. Guide
the cable through the channel under
the product on the right hand side
if required.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dw24unt2x2

Table of Contents