UNI-T UTR2810E Series User Manual page 17

Lcr meter
Table of Contents

Advertisement

completed. It can be escape or continue the short-circuit zero clearing test.
Step 5
LCD displays information "keep fixture short"; If the instrument need to do short circuit zero clearing,
connect the short-circuit plate to the test fixture, or connect the test wire black clip and red clip
together;
Step 6
Press【ENTER】key to start the short circuit zero clearing. LCD displays information "short-circuit
clear is processing";the instrument will automatically scan short circuit zero clearing test for each
range;
Step 7
After that, LCD displays" press ESC EXIT;press CLEAR continue". This step is completed, which
means short circuit zero clearing is completed. It can be escape or continue the open-circuit zero
clearing test again.
1) After the instrument the zero clearing is done, the test condition is changed (replace test fixture,
test clip, temperature and humidity environment), the instrument should do zero clearing again.
2) During zero clearing, press【ESC】key to escape the current test and return the test state, the
original zero clearing data remains unchanged.
3) During short zero clearing, it may occasionally occur "FAIL",in this case, the low resistance
short circuit (the test wire clip or the short-circuit plate) may not be used or the contact is not
UTR2810E Series LCR Meter – User Manual
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Utr2810eUtr2811e

Table of Contents