Location; Rigging And Handling; Unit 4 Point Load Weight - York BUZ024 Installation Manual

Table of Contents

Advertisement

268723-BIM-C-0908

Location

Use the following guidelines to select a suitable location for
these units.
1.
Unit is designed for outdoor installation only.
2.
Condenser must have an unlimited supply of air. Where a
choice of location is possible, position unit on either north
or east side of building.
3.
For ground level installation, a level pad or slab should be
used. The thickness and size of the pad or slab used
should meet local codes and unit weight. Do not tie the
slab to the building foundation.
4.
For roof top installation, be sure the structure can support
the weight of the unit plus any field installed components.
Unit must be installed on a level roof curb or appropriate
angle iron frame providing adequate support under the
compressor/condenser section.
5.
Maintain level tolerance of unit to 1/8" maximum.
Do not permit overhanging structures or shrubs to
obstruct condenser air discharge outlet, combustion air
inlet or vent outlets.
Clearances
All units require certain clearances for proper operation and
service. Refer to Table 4 for the clearances required for
construction, servicing and proper unit operation.
Figure 2: Unit 4 Point Load Weight
Weight (lbs.)
Size
(Tons)
Shipping Operating
024
360
355
(2.0)
030
355
350
(2.5)
036
395
390
(3.0)
042
445
440
(3.5)
048
490
485
(4.0)
060
500
495
(5.0)
4
FRONT
OF
UNIT
"A"
49-1/8
X
Center of Gravity
4 Point Load Location (lbs.)
X
Y
A
22.25
25
96
22.25
25
96
22.25
25
106
22.25
25
120
22.25
25
132
22.25
25
135

Rigging And Handling

Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. Rig the
unit by attaching chain or cable slings to the lifting holes
provided in the base rails. Spreader bars, whose length
exceeds the largest dimension across the unit, MUST be used
across the top of the unit.
If a unit is to be installed on a roof curb other than a
UPG roof curb, gasketing must be applied to all surfaces
that come in contact with the unit underside.
Before lifting, make sure the unit weight is distributed
equally on the rigging cables so it will lift evenly.
Units may be moved or lifted with a forklift. Slotted openings in
the base rails are provided for this purpose.
All panels must be secured in place when the unit is
lifted.
The condenser coils should be protected from rigging
cable damage with plywood or other suitable material.
"D"
CENTER OF
GRAVITY
"B"
47-1/4
Y
B
C
D
84
81
93
84
81
93
92
89
102
104
101
115
115
111
127
117
113
130
"C"
Johnson Controls Unitary Products

Advertisement

Table of Contents
loading

This manual is also suitable for:

Buz030Buz036Buz042Buz048Buz060

Table of Contents