Appendix 3 - Periodic Testing And Maintenance - Honeywell SMX-AUS Installation Manual

Fire alarm control panel (facp)
Hide thumbs Also See for SMX-AUS:
Table of Contents

Advertisement

Fig. 20: SDM on CHS-3L
9

Appendix 3 - Periodic Testing and Maintenance

To ensure proper and reliable operation, system inspection and testing should be scheduled monthly, or as required by local fire codes. A qualified Service
Representative should perform testing.
Before Testing: Notify the fire department and / or central alarm receiving station if alarm condition is transmitted. Notify the facility personnel of the test so alarm
sounding devices are ignored during the test period. Physically disconnect releasing devices.
After Testing: Notify all fire, central station, and/or building personnel when testing is complete. Re-connect releasing devices.
For additional information (Operating, Programming etc.) refer to supplemental documentation.
For additional information on the testing, maintenance and cleaning of the detectors, refer to the Installation and Maintenance Instructions of the
device manufacturer.
NS-MN-0030 / 11.2020
SDM-4 / SAM-4 Card Mounting :
1. Unlock and open Panel Front & Middle Door.
2. Remove power from the panel remembering that there may be more than one source of
power.
3. Fit the supplied standoffs to the CHS style mounting plate.
4. Mount the SDM-4 / SAM-4 as shown in Figure and use the supplied screws to fasten it to
the CHS-3L mounting plate.
5. Connect required Cable Harnesses & Complete the pre power up checks.
6. Power up the Panel after locking panel middle and front door.
Installation Guide SMX-AUS
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

915-200-103915-200-203

Table of Contents