Download Print this page

TALARIA STING Owner's Manual page 18

Hide thumbs Also See for STING:

Advertisement

Inspection of Battery Pack
The electric motorcycle is equipped with 3-Element Lithium-ion battery pack, once the battery pack is fully charged,
please measure the voltage of the positive and negative poles by a multimeter. The proper voltage for a fully
charged battery pack should be in the range of 66.5V to 67.2V. Otherwise, the battery pack may be not fully
charged or got damages, please contact the local dealer to do professional inspection and maintenance.
Caution:
Before you pull out the battery pack, please switch off the circuit breaker first.
When you install the battery pack, if you found it's hard to push the battery pack downward, please pull out
the battery pack to check whether it's stuck by something.
Fuse Replacement
If the dash, horn, lights of the electric motorcycle will not work after the circuit breaker and key switch were
switched on, it's possibly that the fuse is melt. Then, please switch off the circuit breaker, and replace the
fuse.
Unlock the battery pack holder cover, and pull out the battery pack. Then, you will find the fuse box in the
front of the circuit breaker, and open it.
Remove the melt fuse, and replace it with the spare fuse. Then, well close the fuse box, install the battery
pack, and lock the battery pack holder cover.
Caution:
Please make sure the spare fuse is properly fixed. If the spare fuse is loose, may cause serious fault or
hazards.
The spare fuse should be the correct recommended type and spec, otherwise, the fuse will not be melted to
work out the protection when it's necessary.
If the spare fuse is melted in a short time after it's replaced, please contact the local dealer to check for any
other possible reasons and fix the problem.
The fuse box should not be flushed by water.

Hide quick links:

Advertisement

loading

Related Products for TALARIA STING