Download Print this page

Regular Inspection And Maintenance - TALARIA STING Owner's Manual

Hide thumbs Also See for STING:

Advertisement

Battery Pack Pull Out
Switch off the key switch, and take the key to unlock the battery pack holder cover, and then, you will have
the battery pack in sight.
Switch off the circuit breaker, unplug the battery pack discharge connector, then pull out the battery pack by
lifting upward.
Battery pack installation
Use the key to unlock the battery pack holder cover.
Install the battery pack by putting downward, but please pay attention to the direction (the battery pack
charging interface should be on the left side). After the battery pack installed properly, please well plug the
battery pack discharging connector, switch on the circuit breaker. Finally, lock the battery pack holder cover,
and take off the key.
Warning
Before you pull out or install the battery pack, please switch off the circuit breaker.
The battery pack discharge connector should be well plugged, otherwise, the battery will not be identified,
and cause the electric motorcycle to fail to run.

Regular inspection and maintenance

For your safety, as well as to increase the lifetime of the electric motorcycle, and enjoy a safe and comfortable
riding, it's strongly recommended to do inspection and maintenance for your electric motorcycle regularly. If
your electric motorcycle will have long time no use, regular inspections and maintenances are still required.
The first inspection and maintenance need to be done after the 300KM run-in period.
Take full care of safety and follow this manual when you do inspection and maintenance.
When your do inspection and maintenance, it's recommended to park your electric motorcycle on the flat
ground.
If the emergent inspection and maintenance is required to do during the riding, you need to pay attention to
the surrounding environment and situation, and find a safe place to finish the inspection and maintenance.

Hide quick links:

Advertisement

loading