Start-Up And Commissioning - Rinnai DO-SC18Z91 Operation & Installation Manual

Table of Contents

Advertisement

Ensure that a Return Air Filter is fitted prior to fan start up
Measure and record the system details as noted under PRELIMINARY SYSTEM INFORMATION and check
all items as noted under PRE START-UP on the Commissioning Sheet provided
Switch the unit on in cooling mode with the thermostat set to minimum temperature set point
Measure and record all items as noted under OPERATION CHARACTERISTICS on the Commissioning Sheet
provided
Check suction and liquid pressures
Care must be taken to charge the system correctly. Undercharge will result in lack of capacity and the unit
may lock out on its LP (Low Pressure) safety switch. Overcharge will result in high head pressures whilst unit
is operating
Measure the compressor suction pressure and convert to a compressor saturated suction temperature (CSST)
using R410a refrigerant pressure/temperature table. Refer to Table 5.
Measure the suction line temperature (SLT) approximately 100mm before the compressor
Calculate the superheat (SH) = SLT – CSST
Measure the compressor discharge pressure and convert to a condensing temperature (CT) using R410a
refrigerant pressure / temperature table. Refer to Table 5.
Measure the liquid line temperature (LLT) between the outdoor coil and indoor unit throttling device in cooling
mode
Calculate the sub-cooling (SC) = CT – LLT
Measure the outdoor ambient air temperature
Measure the indoor return and supply air dry bulb temperatures, both before and after the indoor coil
Measure the indoor air quantity ensuring it falls within the indoor coil's limits
Adjust the fan speed to suit the static pressure and air quantity requirements
Allow system pressure to stabilise for a minimum of 20 minutes
Instruct the customer on system capability and correct operation
Please ask the customer to fill in the CUSTOMER DETAILS section and to register their product warranty
Table 5. R410a Saturated Pressure – Temperature chart
Saturated
Temperature °C
-40
-38
-36
-34
-32
-30
-28
-26
-24
-22
-20
-18
-16
-14
-12
-10
-8
-6
Source: (Courtesy Coolpak refrigeration).
Data points are reproduced based on available information. BRIVIS assumes no responsibility or liability for data errors
Brivis

7. START-UP AND COMMISSIONING

Gauge
Saturated
Pressure
Temperature
kPa
°C
79
-4
95
-2
113
0
132
2
152
4
174
6
196
8
221
10
246
12
274
14
303
16
334
18
366
20
400
22
436
24
475
26
515
28
557
30
Gauge
Pressure
Temperature
kPa
602
648
697
749
803
859
918
980
1045
1113
1183
1257
1334
1414
1497
1584
1674
1768
49
Saturated
Gauge
Pressure
°C
kPa
32
1866
34
1968
36
2073
38
2183
40
2297
42
2415
44
2537
46
2664
48
2796
50
2932
52
3073
54
3219
56
3371
58
3527
60
3689
62
3857
64
4031
66
4210
ICE Fixed Speed OIM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Di-xu18zDo-sc22z91Di-xu22z

Table of Contents