Unload Bridge Installation BMP070009/2020432A Air and Duct Requirements for Milnor® Pass-through BNDDUI01/2022242 Utility Requirements For Gas, Steam and Thermal Oil Dryers BNDUUI01/2019285A About the Steam and Hot Oil Control System for Milnor Dryers MSSM0102BE/2003123V 3. Installation Drawings Dimensional Drawing - 6458TS1L BD6458TS1LEE/2022086D...
(unless the time period is specifically extended for certain parts pursuant to a specific MILNOR published extended warranty) from our factory with no operating hour limitation. This warranty is contingent upon the equipment being installed, operated and serviced as specified in the operating manual supplied with the equipment, and operated under normal conditions by competent operators.
• If the component is an electrical component, give the schematic number if known. • If the component is a motor or an electrical control, give the nameplate data from the used component. To write to the Milnor factory: Pellerin Milnor Corporation Post Office Box 400...
BNUUUU02 / 2021104A BNUUUU02 0000158094 3/3/21 9:47 AM Released Trademarks BNUUUU02.R01 0000158093 F.2 E.2 3/3/21 9:47 AM Released ® These words are trademarks of Pellerin Milnor Corporation and other entities: Table 1. Trademarks AutoSpot™ GreenFlex™ MilMetrix ® PulseFlow ® ®...
The owner/user must familiarize himself with the contents of all machine instruction manuals. The owner/user should direct any questions about these instructions to a Milnor® dealer or the Milnor® Service department.
Page 11
The Safety Guide and other machine manuals must be available at all times to the appropriate personnel. See the machine service manual for safety placard part numbers. Contact the Milnor Parts department for replacement placards or manuals. Maintenance —Ensure the machine is inspected and serviced in accordance with the norms of 1.5.
Page 12
They can produce explosive fumes when heated. • Do not use flammable solvents in processing. • Do not load machine with goods containing dry cleaning materials. • Do not use the machine in the presence of solvent fumes. PELLERIN MILNOR CORPORATION...
Page 13
• Verify the overheat control system and plant fire extinguishers are functioning before operating the machine. Be sure to turn water supply on after testing. • Keep the manual shut-off test valve open except when testing. • Test or inspect the system after every automatic actuation, or monthly. PELLERIN MILNOR CORPORATION...
Page 14
These components move automatically. • Do not service the machine unless qualified and authorized. You must clearly understand the hazards and how to avoid them. PELLERIN MILNOR CORPORATION...
Page 15
Hazards include but are not limited to panic, burns, poisoning, suffocation, heat prostration, biological contamination, electrocution, and crushing. • Do not enter the cylinder until it has been thoroughly purged, flushed, drained, cooled, and immobilized. — End of BIUUUS27 — PELLERIN MILNOR CORPORATION...
Paper tags on the machine provide installation guidelines and precautions. The tags can be tie-on or adhesive. You can remove tie-on tags and white, adhesive tags after installation. Yellow adhesive tags must remain on the machine. PELLERIN MILNOR CORPORATION...
Page 17
Read the manuals before proceeding. This symbol appears on most tags. The machine ships with safety, operator, and routine maintenance guides for customer use. Milnor dealer manuals for installing, servicing, and commissioning this machine are also available from the Milnor Parts department.
Page 18
A tag will also appear on the restraint to help identify it. Most, but not all shipping restraints display the color red. Some shipping restraints are also safety stands. Do not discard these. PELLERIN MILNOR CORPORATION...
Page 19
B2T2007003: Install the shuttle rail in accordance with this instruction and the installation manual. B2T2014022: This control box is mounted here for shipping purposes only. (Only used on 64" and 76" gas and steam dryers with a blower inverter.) — End of BIUUUI02 — PELLERIN MILNOR CORPORATION...
Front View Blower Right Model Notes: 1. Replace placard immediately, if removed or unreadable. 2. Approximate locations of placards are shown. Mounting holes are provided on machine. If aluminum placard use #8 self-tapping screws. PELLERIN MILNOR CORPORATION PELLERIN MILNOR CORPORATION...
Page 21
"Used In" column to identify which components belong to an assembly. The item numbers (1, 2, 3, etc.) assigned to components relate the parts list to the illustration. Description Item Part Number Comments Used In -----------------------------------------------------------------------------COMPONENTS------------------------------------------------------------ 01 10451B NPLT:DRYER WARNINGS-TCATA 01 10377A NPLT:ELEC HAZARD LG-TCATA 01 10375B NPLT:ELEC HAZARD SMALL-TCATA 01 10699A NPLT:SERV HZRD-PLYEST-TCATA PELLERIN MILNOR CORPORATION...
ISO Placards shown on this page Notes: 1. Replace placard immediately, if removed or unreadable. 2. Approximate locations of placards are shown. Mounting holes are provided on machine. If aluminum placard use #8 self-tapping screws. PELLERIN MILNOR CORPORATION PELLERIN MILNOR CORPORATION...
Page 23
"Used In" column to identify which components belong to an assembly. The item numbers (1, 2, 3, etc.) assigned to components relate the parts list to the illustration. Item Description Used In Part Number Comments ----------------------------------------------------------------------------COMPONENTS------------------------------------------------------------ 01 10451X NPLT:DRYER WARNINGS -ISO 01 10377 NPLTE:"WARNING" 4X4 01 10375 NPLTE:"WARNING" 2X2 PELLERIN MILNOR CORPORATION...
6450, 6458, 6464, 7272, 7676, 8282 Dryers Side Doors Prior to 2014 See BMP020051. Side Doors after 2014 BMP160009. Dryer side panels are only supplied on Stand-Alone Dryers and used on the side opposite the blower. PELLERIN MILNOR CORPORATION PELLERIN MILNOR CORPORATION...
Page 26
6464 LOWER SIDE COVER 07 81435 7272 BLOW SIDE LOWER COVER 07 85397 7676 HOUSE SIDE PLATE 07 88073 8282 HOUSE SIDE PANEL W7 71205A 64" DRYER FRONT COSMETIC LOWER DOOR WELD 07 81205 7272 FRONT COSM-LOWER DOOR PELLERIN MILNOR CORPORATION...
Page 27
W7 71317B 6458 BRNG CVR SHORT-LEFT SHORT SHROUD A82BC001 8282 BRNG COVER SHORT ASSEMBLY SHORT SHROUD W7 71317D 6458 BRNG CVR SHORT-RIGHT SHORT SHROUD A82BC001 8282 BRNG COVER SHORT ASSEMBLY SHORT SHROUD 60A114 SELF-GRIP GASKET EMKA 1011-17 PELLERIN MILNOR CORPORATION...
BMP140052/2016445A Page (1 / 2) Unload Shrouds 6458TG1L/R,TS1L/R 6464TG1L/R,TS1L/R 7676TG1L/R 8282TG1lL/R 6458TG1L/R, TS1L/R 7676TG1L/R 6464TG1L/R, TS1L/R 8282TG1L/R Standard Shroud Standard Shroud 7,8,9,10 typical hardware all shrouds Short Shroud Short Shroud PELLERIN MILNOR CORPORATION PELLERIN MILNOR CORPORATION...
Page 31
BMP140052/2016445A Page (2 / 2) Unload Shrouds 6458TG1L/R,TS1L/R 6464TG1L/R,TS1L/R 7676TG1L/R 8282TG1lL/TG1R Parts List—Discharge Shroud Find the correct assembly first, then find the needed components. The item letters (A, B, C, etc.) assigned to assemblies are referred to in the "Used In" column to identify which components belong to an assembly. The item numbers (1, 2, 3, etc.) assigned to components relate the parts list to the illustration.
Page 34
ATTENTION INSTALLERS! FLOOR IS UNEVEN Establish System Zero Line or Z. Find highest point in factory floor where footpads will be located. System Zero Line or Z is 1” above highest point. DRYER FEET MUST TO NEXT MOVE TO FOOTPAD FOOTPAD LOCATIONS BE GROUTED LEVEL...
Do not hesitate to file a claim with the carrier if the machine has been damaged in any way during shipment. Milnor® will be glad to assist you in filing your claim, but is not responsible for shipping damage to the machine once it has been delivered to the carrier in good condition.
Page 36
Dryer Assembly and Setting Figure 1: Front Lifting Bracket Figure 2: Rear Lifting Bracket Figure 3: Spreader Bar Between Front Lifting Plates Figure 4: Apply sealing foam to left house before setting into position PELLERIN MILNOR CORPORATION...
Page 37
(see the dimensional drawing). It is occasionally possible to reduce the overall dimensions by removing piping and by other special modifications. Consult the Milnor factory for more information. • Provide sufficient clearance around machine for normal operation and maintenance procedures.
Page 38
Consult Milnor if any obstruction prevents the installation of any anchor bolts. Anchor bolts cannot be indiscriminately omitted.
Page 39
—Check the interior of the perforated cylinder for smoothness 3.5. before placing the machine in service. Milnor cannot accept claims for damage to the cylinder's smooth finish after the machine has been placed in service. — End of BIPD6I02 —...
Page 41
Page (2 / 2) Lifting Brackets 5040TG2L/R,TS2L/R, 5050TG1L/R,TS1L/R, 6450TG1L/R 6458TG1L/R,TS1L/R, 6464TG1L/R,TS1L/R, 7272TG1L/R,TS1L/R, 7676TG1L/R 8282TG1L/R Parts List—Lifting Brackets Find the correct assembly first, then find the needed components. The item letters (A, B, C, etc.) assigned to assemblies are referred to in the "Used In"...
4,5,6 TYPICAL 3 SHIM Lifting brackets on the left and right machines are joined using Covers for nameplate spacers and bolts. and emergency stop replacement. See Instruction, “Dryer Installation” BIPD6I02. PELLERIN MILNOR CORPORATION PELLERIN MILNOR CORPORATION...
Use a level to identify the parts. Swapping these parts when assembling will cause the top flange to stick up above the rest of the pedestal and cause the dryer to sit incorrectly. P... Varies Pellerin Milnor Corporation...
Page 45
S... Location of buck boost transformers and blower inverter box when mounted to the pedestal front T... Typical U... Optional bumper guards Typical Hardware V... Bolt the house to the pedestal in 8 places. Pellerin Milnor Corporation...
Page 53
1.1. Air Flow BNDDUI01.C03 0000086789 A.10 A.11 Released All Milnor pass-through dryers move air, called main air, through the goods. The quantity of main air specified in document BNDUUI01 “Utility Requirements for Gas, Steam, and Thermal Oil Dryers” (in standard cubic feet per minute or scfm) must be available at the dryer main air inlet.
Page 54
Air and Duct Requirements for Milnor ® Pass-through Dryers 2.1. Is an Inlet Duct Necessary? BNDDUI01.C06 0000086786 A.10 A.11 Released Use an inlet duct to avoid negative air or if hazardous or corrosive fumes are present that could be drawn in to the dryers. Otherwise, consider the facility layout, operational procedures, and cli- matic conditions.
Back Pressure, page 1 automatically. A system of this type could include pressure-sensing devi- ces, a variable-speed booster fan, and a controller. Today, facility designers generally prefer internal lint screens (a Milnor ® option) or close-coupled lint collection systems installed on each dryer. However, if the facility uses a common, powered lint collection system, you can connect the air exhaust from two or more dryers to this system if you run separate ducts from each dryer.
Page 56
Air and Duct Requirements for Milnor ® Pass-through Dryers Figure 1. Round duct elbow fabrication Legend Elbow radius Segmented elbows D... Cross-section diameter Rl. . . Long radius (Rl = 1.5 x Rs. . . Short radius (Rs = D)* 1...
Page 57
Air and Duct Requirements for Milnor ® Pass-through Dryers Units of Measure (cont'd.) meters per Air velocity feet per minute (npm) minute Pressure drop inches water (Pa) Pascals column 3.2. Duct Components and Their Pressure Drops BNDDUI01.R03 0000086877 A.10 A.11 Released The table that follows, gives selected round and rectangular duct sizes for each dryer model, in straight lengths and 90 degree elbows.
Page 58
Air and Duct Requirements for Milnor ® Pass-through Dryers Duct Sizes and Pressure Drops for Dryer Models (cont'd.) Air Specifications Duct components, sizes, and pressure drops Equivalent** cross-sections Pressure drop - iwc (Pa) Rectangular*** Straight 90 Degree Elbows Round Velocity*...
Page 59
Air and Duct Requirements for Milnor ® Pass-through Dryers Figure 3. Example Duct Layout for Model 6464TG1L Dryer Isometric View of Duct Layout Legend CL. . . Center line. ED. . . Exhaust duct. This example uses 26 inch (660 mm) diameter round duct.
Page 60
Air and Duct Requirements for Milnor ® Pass-through Dryers 3.4. Pressure Drop Equations and Examples BNDDUI01.C14 0000087352 A.10 A.11 Released Calculate the pressure drop for each straight length of duct as follows: = PD x L / 100 Where: = Pressure drop for a straight length...
BNDGUI01 “Air and Ductwork Requirements for Milnor ® Pass-through Dry- ers” gives design criteria for customer-supplied inlet and outlet ductwork...
Page 62
160 to 225 psi (1103 to 1551 kPa) will not operate properly below 115 psi (793 kPa). Conform to the rated pressure of the steam coil as stated on the ma- � chine nameplate. Choose a steam trap with a pressure rating corresponding to the actual pressure � supplied. Pellerin Milnor Corporation...
Page 63
@ 13.5" column (343) (343) (343) (343) Gas inlet with ratio air burner (natural gas and propane models) Maximum Btu/hr (kcal/ 1,300,000 1,800,000 1,800,000 3,000,000 n.a. pending hr) at x" (mm) water (327,800) (453,000) (453,000) (756,000) column Pellerin Milnor Corporation...
Page 64
(kw) Average boiler horse- 11.1 (8.3) 16.3 (12.1) 18.5 (13.8) 22.2 (16.5) 37.0 (27.6) 46.6 (34.7) power (kw) Thermal oil inlet (thermal oil models) - Consult Milnor ® factory Main air intake Maximum scfm (cu m/ 3,600 8,500 14,000...
Page 65
Gas line vent (gas/propane models) 1/4" stainless steel. Must be vented from the regulator vent to the exterior of the building. Steam condensate outlet (steam models) Per plumbing code. Return condensate to boiler through a steam trap of the correct size. Two steam traps are available from Milnor ® : One for 85 - 180 PSI (6 - 12 ATU) and one for 160 - 225 PSI (11 - 15 ATU).
Page 66
1. Unbolt and remove red restraint. 2. Install the belt guard. 3. Locate the blower contactor inside the high voltage electric box. 4. Match the tagged coil wire with the tagged contactor coil terminal and reconnect. Pellerin Milnor Corporation...
Page 67
The guards protect the machine from the constant impact of laundry carts placed under the discharge door. Hence the height at which the guards are installed must match the height of the carts used. See Figure 3 Pellerin Milnor Corporation...
Page 68
Utility Requirements For Gas, Steam and Thermal Oil Dryers Figure 3. Bumper Guard Installation Legend Where to install bumpers A... Bumper guards B... Height determined by user End of document: BNDUUI01 Pellerin Milnor Corporation...
Page 69
È A BOUT THE STEAM AND HOT OIL CONTROL SYSTEMS FOR MILNOR DRYERS MILNOR steam dryers are available with an optional Y-type ON/OFF steam valve. MILNOR hot oil dryers use a modulating oil inlet/bypass valve. Ê H ow To Protect Steam Coils From Water Hammer Damage Steam coils can be damaged when steam pressure is suddenly applied to a water (condensate) filled coil, or when the steam is “wet”...
Page 70
Clean and “blow down” steam trap and strainer screens after 40 hours of operation and periodically thereafter. Clogged strainer screens will cause longer drying times. Ê A bout the Optional On-Off Steam Control System with Y-type, Air Operated Valve In addition to the steam trap and strainer, dryers equipped with the optional Main Steam Inlet ON/OFF valve are fitted with: a.
Page 71
Ê A bout the Modulating Hot Oil Valve Ë H ow Modulated Hot Oil Works —Hot air inlet and out- let temperatures are monitored by the dryer control. When the dryer control detects actual temperatures that are either under or over the desired value it signals the hot oil positioner and valve to change the percent of pressurized hot oil sent to the dryer heating coil, verses the percent that bypasses the heating coil.
Page 72
TIFHTOF LDA MVP BSPD XXX+XXX XXX 000 XXXX Dryer will continue at minimum valve position until com- manded to return to automatic. Returns to automatic. Follow the step-by-step procedure to set the system compo- nents. Ë W hen Recalibration is Required –...
Page 73
Ê C alibrating the Hot Oil Positioner/Valve The positioner cam must be adjusted so that the valve travels from fully diverted to fully open as the modulat- ing valve position varies from 000 to 255. Refer to “How to Manually Command a Modulating Valve Position” elsewhere in this section then follow the step by step procedures below.
Page 74
Ë V erifying Positioner/Valve Settings Closes modulating valve. Hold until TIFHTOF LDA BSPD hold MVP=200, verify settings then XXX+XXX XXX repeat for 150, 100, 050, and 000. Since the zero and range adjustments affect each other, verify that for each of the five MVP’s commanded, the valve moves approximately 1/5 of the way from fully open to fully diverted, and: •...