Packaging And Transportation; Scope Of Delivery; Transportation - Rinnai E50C Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

Available languages

Available languages

4

Packaging and transportation

4.1 Scope of delivery

4.2 Transportation

!
CAUTION
The boiler is supplied ready for use.
Please check if the packaging is intact.
Check if all the items listed are included in the delivery.
The supply kit contents:
Part No.
Description
Boiler with:
ARV1215U
Outdoor reset sensor ARV12
44215900
Compression ring Ø22 brass
44237500
Compression ring Ø15 brass
44357010
Screw 4,8X16mm
44380900
Line voltage input connector 3 pole grey
44457400
Nut W1.1/8x1/14 22 Compression fitting
44527600
Cap de-aerator
44748300
Flow restriction MR01 FG 7,6L white
44765910
Adapter fitting 15mm x 3/4"NPT ext.
44786700
Water lock 1/2"NPT x 1/4"NPT
44786800
T/P Gauge 1/4"NPT
44786900
Safety valve 3/4"NPT
44840100
Adapter fitting 22mm x 1"NPT ext.
71035700
Nut 15mm compression fitting
Wall mounting suspension bracket
8U51650x
Installation & Service Instructions
8U52650x
User information manual
8U304000
Warranty document
8U300600
ICSL book
The boiler may be damaged when not secured properly.
-
Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
-
When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
-
Protect all parts against impacts if they are to be transported.
-
Follow the transportation markings on the packaging.
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Install Parts Bag E50C:
Amount
E50C
804000088
44839200
1
4
4
4
1
2
1
1
2
1
1
1
2
2
1
1
1
1
1
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents