Lenovo ThinkSystem SR250 V2 Maintenance Manual page 92

Hide thumbs Also See for ThinkSystem SR250 V2:
Table of Contents

Advertisement

"Safety" on page iii
"Installation Guidelines" on page 51
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
"Power off the server" on page
• If the server is installed in a rack, remove the server from the rack.
Watch the procedure
A video of this procedure is available at YouTube:
BPZOAqQMD37KjuxaVHVBkH
Procedure
Step 1.
Make preparations for this task.
a.
Remove the top cover. See
b.
Disconnect the front operator panel cables from the system board. See
routing" on page
Step 2.
Remove the two screws that secure the front operator panel.
Figure 71. Front operator panel removal
Step 3.
Pull out the front operator panel from the server.
Figure 72. Front operator panel removal
ThinkSystem SR250 V2 Maintenance Manual
84
11.
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
.
"Remove the top cover" on page
35.
132.
"Front panel cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d7q7d7r

Table of Contents