Start Up Check List - Hussmann FNGSC-A Installation & Operation Manual

Dual temperature self contained island merchandiser
Table of Contents

Advertisement

P/N 3141959_C
Hussmann Self-Contained Refrigeration Equipment Start Up Check List
***Please note that failure to follow this start-up document may void your factory warranty***
Step
Locate, read and keep install/operation manual in a safe place for
1
future reference .
2
Examine unit . Confirm there is NO damage or concealed damage .
3
Level the unit, side to side and front to rear .
Unit must be run on a dedicated electrical circuit. Do not use
4
adapters.
Ensure that the proper electrical requirements for the equipment are
5
supplied .
Verify all electrical wiring is secured and clear of any sharp edges or
6
hot lines . Connect plugs (2) to the outlet.
Some water should be placed in the drain to close the siphon and
7
prevent formation of ice.
8
Verify the condensate drain line is properly trapped and pitched .
9
Verify all required clearances on the sides and back of unit .
Verify there are no air disturbances external to the unit . Heat and air
10
registers, fans, and doors etc .
Advise owner/operator that merchandiser must operate at temperature for 24 hrs prior to loading
with product.
LEGAL DISCLAIMER:
Hussmann shall not be liable for any repair or replacements made without the written consent of Hussmann, or when the product is installed or operated in a manner
contrary to the printed instructions covering installation and service which accompanied such product.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Startup Activity
FNGSC-A Self Contained Merchandisers
1-5
Check

Advertisement

Table of Contents
loading

Table of Contents