Standoff And Drywall Support Preparation - Lopi 864 TRV 31K CleanFace Manual

Table of Contents

Advertisement

10
Finalizing the Installation

Standoff and Drywall Support Preparation

The two standoffs and three drywall supports are shipped in the flat position. Make sure to bend (and
secure) the standoffs and drywall supports as shown below.
The two standoffs are shipped flat.
Bend the three drywall supports up 90 degress (the
outer two are concealed when the standoffs are flat).
When in place, the
standoffs and drywall
supports should look
as shown to the
right.
© Travis Industries
(for qualified installers only)
Bend both standoffs as shown below.
Remove the screw from the top of the
fireplace and secure the standoff as shown.
6/27/2019 - 1500
864 31K CF Aust

Advertisement

Table of Contents
loading

Table of Contents