Panasonic GS-G90KE Service Manual page 44

Table of Contents

Advertisement

Installation Information
Indoor / Outdoor unit installation diagram
Length of power supply cord
about 1.1 m
about 1.8 m
< <
<
• This illustration is for explanation purposes only.
The indoor unit will actually face a different way.
Piping direction
Right
Right
<
rear
Right bottom
5 cm or
more
Air purifying filter 5
(Left and right are identical)
Insulation of piping connection
Carry out installation
after checking for gas
leaks.
After securing with
three of the vinyl
tape 8, wrap with
vinyl tape 9.
Vinyl tape 8
(Front side)
Left
Left
rear
Left bottom
Installation plate 1
Sleeve (*)
Bushing-Sleeve (*)
Putty, (Gum Type Sealer) (*)
Bend the pipe as closely on the
wall as possible, but be careful
that it doesn't break.
Vinyl tape (Wide) (*)
• Apply after carrying out a
drainage test.
• To carry out the drainage
test, remove into the heat
Vinyl tape
exchanger. To carry out the
9
drainage test, remove into
the heat exchanger.
Saddle (*)
Connecting cable
(4-CORE WIRE/1.5 mm
Locally approved cable.
Additional drain hose (*)
1/4" Liquid side piping (*)
Gas side piping (*)
3/8" (G90KE)
1/2" (G120KE)
Vinyl tape (*)
(Narrow)
– 50 –
CS-G90KE
Attention not to bend up drain hose
Installation parts you must
purchase (*)
2
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gu-g90keGs-g120keGu-g120ke

Table of Contents