100
101
102
103
104
105
DMS-100 Family NA100 Trouble Locating and Clearing Procedures Volume 2 of 2 LET0015 and up
Trouble locating and clearing procedures (continued)
where
link_no
is the number of the link (0 to 15)
If the ACT command
passed
failed
is other than listed here
Determine the synchronization state of the link.
Note: The synchronization state appears under the Sync Stat header of
the MAP display.
If the synchronization state
is Alnd
is other than listed here
Wait 8 minutes, and continue with this procedure.
Determine the synchronization state of the link.
If the synchronization state is
not Alnd, and you
did not ask the far-end office to
activate the link
already asked the far-end office
to activate the link
Determine from office records the far-end office that connects to the linkset
posted in step 4.
Contact the far-end office. Tell the person at that location that
•
you are going to busy and deactivate the link in order to realign it, and that
•
the person and you must activate the link from both ends after you busied
and deactivated the link
Go to step 100.
To deactivate the link, type
>DEACT
link_no
and press Enter.
where
link_no
is the number of the link you activated in step 99
Running a C7BERT
Do
step 100
step 109
step 109
Do
step 107
step 101
Do
step 103
step 105
FORCE
1-341
(continued)