Service - Raytheon 138-119 Operator's And Service Manual

Table of Contents

Advertisement

5.2.4

Service

After accomplishment of a service a setting to work procedure and a function test has to be
done again (see section 3.3 Setting to work and 3.4 Function test).
Edition: April 06, 2005
Change Over Box
138- -119
ATTENTION!
Devices can be faulty.
While exchangeing electonical components the equipment has
to have zero potential.
NOTE!
While closing again the housing after a repair or an
installation, the cover has to be set carefully.
The seal may not be crushed, if necessary push the
sidewall slightly.
36
3769DOC000002

Advertisement

Table of Contents
loading

Table of Contents