Viessmann Vitocell 100-E Installation And Service Instructions Manual page 8

Table of Contents

Advertisement

Installation sequence
Siting the cylinder
!
Please note
Exposure to frost can damage the appliance.
Install the buffer cylinder in a room that is free
from the risk of frost and draughts. Otherwise,
the buffer cylinder must be drained if there is a
risk of frost while it is not in use.
Provide adequate clearance from the wall to allow for
operation of the temperature controller (if installed).
Placing the heating water buffer cylinder on a plinth
will make the room easier to clean.
Use adjustable feet to level the buffer cylinder.
Fitting the lower thermal insulation mat and aligning the cylinder body
1.
A
2.
B
Fig. 1
Bag containing type plate
A
Bag containing 3 adjustable feet
B
3. Insert the adjustable feet into the legs as far as
they will go, then adjust them to level the cylinder
body.
8
!
4.
3.
3x
Please note
The thermal insulation must not come into con-
tact with naked flames.
Exercise caution when welding and brazing.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Svpb

Table of Contents