Overview of Installation and First Startup

22
Below is an overview of the installation process. See the
Installation and First Startup Guide for complete installation
details.
1
If not already installed, install the GC and Agilent data
system. (If another detector is present, verify its
performance.)
2
Place the detector on the bench. Remove protective caps.
3
Prepare the GC. Cool the GC, then turn off and unplug the
power cord. Remove covers.
4
Prepare the detector mounting location.
5
Unpack the vacuum pump. Remove plugs. Install oil
coalescing filter and ballast.
6
Install the vacuum pump.
7
Verify the power configuration.
8
Install the burner assembly.
9
Connect the supply gases.
10
Connect the detector gases.
11
Connect the detector cables and wires.
12
Connect cables to the GC and detector.
13
Connect to power.
14
Install the column.
15
Install the GC covers.
16
Turn on the GC and the detector.
17
Configure the detector.
18
Create a checkout method and verify performance.