5.3. Operate the boom system
1
1
1. Extend the extensions until they are
released from the hook. Operate the 1st
boom 1-1.5m out from the column.
3
3. Extend the hydraulic extension until the
grapple is feee from the support hook.
5. Push the second boom against the ground
and raise the 1st boom slowly.
40
Starting crane operation
5
Jonsered 1250RZ -1500RZ safety+R CE
2. Operate the 2nd boom to an upright
position.
4. Push the grapple against the ground and
straighten the 2nd boom.
2
4