Download Print this page

Door Assembly - Arrow Storage Products NW108A Owner's Manual & Assembly Instructions

Storage area: 74 sq. ft. 401 cu. ft. 6,9 m2 11,4 m3

Advertisement

Step 17
A30a ctr
(6)
(12)
The steps on this page tell how to
assemble the right door. You will
perform exactly the same procedures
for the left door. Each bolt and screw in
the door requires a washer. Proceed
as follows:
1
Attach the door handle brace
and handle to the door with 1 bolt
as shown. Don't tighten the bolt yet.
2
Swing the door handle brace up
to the hole on the center of the door
and insert a screw.
3
Hold the vertical door brace
against the center of the inside
surface of the door and turn the screw
to hold the vertical door brace and
door handle brace in place. Fasten
to door above and below center
connection using 2 screws.
4
Insert a second bolt in the door
handle and tighten both bolts.
5
Put a horizontal door brace onto
the top edge and bottom edge and
fasten with 1 bolt in the center.
6
Attach the lower door guides and
bolts as shown.
7
Repeat steps 1 through 6 for the
left door.
Parts Needed For

Door Assembly

(4)
30028
80251
Left Door Assembly
80251
9355
66382
30
3719
Door Handle Brace (2)
80251 Right and Left Doors (2)
10497 Horizontal Door Brace (4)
9355
Vertical Door Brace (2)
30028 Nameplate (1)
66775 Plug (2)
Right Door Assembly
10497
10497
3719
3719
10497
10497
END VIEW
SHOWING:
Horizontal
Door Brace
80251
66775
80251
9355
Door
Washer
Guide

Advertisement

loading

This manual is also suitable for:

Nw108pMrd108