Download Print this page

Arrow Storage Products NW108A Owner's Manual & Assembly Instructions page 22

Storage area: 74 sq. ft. 401 cu. ft. 6,9 m2 11,4 m3

Advertisement

Step 9
A22 ctr
(18)
The door jambs reinforce the door
opening and provide an attractive
trim. Follow these steps for both
door jambs.
1
Fasten the front wall channels
in their positions between the end of
the side wall channel and the corner
panel using screws. Do not put a
screw in the hole at the end behind
the door opening at this time.
2
Fasten a door jamb to the front
panel with two bolts, nuts and acorn
nuts, as shown.
3
Fasten the center of the door
jamb to the front wall panel and the
front wall channel with two screws.
4
Fasten the top of the door jamb
to the door track with two screws. Do
the same for the bottom into frame.
Repeat steps 2 through 4 for the
opposite door jamb.
Parts Needed For
Front Channel/Door Jamb
(4)
Acorn Nut
Hex Nut
Acorn Nut
9365
STEP
1
STEP
(2) bolts
2
Bolt
9900
STEP
4
22
9900 Door Jamb (2)
9365 Front Wall Channel (2)
INSIDE OF
BUILDING
TOP VIEW
Door Track
9900
Front Wall Channel
Cross-Section
TOP VIEW
Top View
Front Wall Channel
Screw
Screw
STEP
3
TOP VIEW
Door Track
Screw
Screw

Advertisement

loading

This manual is also suitable for:

Nw108pMrd108