Slant/Fin VICTORY VSPH/NDV-60 Installation And Operating Instructions Manual page 10

Gas-fired cast-iron boilers for natural and l.p. propane gases
Table of Contents

Advertisement

10
VICTORY VSPH/NDV MODELS, VENTING THROUGH A ROOF
A
**RAIN CAP TERMINATION MAY BE USED
BUILT-IN
CONDENSATION
DRAIN & TRAP
PRESS./TEMP.
GAUGE
FILL TRAP
WITH WATER
AIR INTAKE
(DO NOT BLOCK)
Figure 7. Victory VSPH/NDV models venting through the roof
* AL 29-4C IS A REGISTERED TRADEMARK OF ALLEGHENY LUDLUM CORP.
All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia.
AL29-4C* S.S. venting materials (See page 5).
ALTERNATE VERTICAL TERMINATION
45˚ ELBOW
FIRESTOP AND
SUPPORT
SLOPE UP 1/4 IN.
PER FOOT MIN.
VSPH/NDV BOILER
TO DRAIN OR
CONTAINER
90˚ TERMINATION
ELBOW WITH SCREEN
10 FT. MIN
V
ICTORY VSPH Models
VENT
TERMINATION
TEE WITH SCREEN
1 FT MIN.
FLASHING AND
STORM COLLAR
6" MIN
3 IN. DIA.
S.S.VENTING MATERIAL
FIRESTOP AND
SUPPORT
3 IN. DIA.
S.S.VENTING MATERIAL

Advertisement

Table of Contents
loading

Table of Contents