INSTALLATION AND OPERATING INSTRUCTIONS
HOT WATER-Models GG-300 through GG-399HES
CONTENTS..........................................................................PAGE
Dimensions ..................................................................................2
Gas Orifice Sizes ........................................................................2
Boiler Location ........................................................................3
Boiler Foundation ....................................................................3
Minimum Clearance ....................................................................4
Vent Piping ..............................................................................4
Gas Piping ..................................................................................4
Water Treatment ....................................................................10
Wiring Diagram ..........................................................................12
Replacement Parts ....................................................................14
Appendix A ................................................................................15
Heating Contractor
Address
Phone Number
Part No. 41-2842
GAS-FIRED CAST IRON BOILERS FOR NATURAL
INTERMITTENT PILOT IGNITION
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS
AND STATEMENTS BEFORE READING THE
INSTALLATION INSTRUCTIONS
WARNING
LIQUEFIED PETROLEUM (L.P.)
PROPANE FIRED GAS BOILERS
Installation location ONLY as permitted in paragraph entitled
"LIQUEFIED PETROLEUM (L.P.) PROPANE GAS FIRED
BOILER LOCATION" on page 3 of this instruction book.
The above warning does not apply to NATURAL gas fired boilers.
The installation must conform to the requirements of the authori-
ty having jurisdiction or, in the absence of such requirements, to
the National Fuel Gas Code, ANSI Z223.1-latest edition. The
installation must also conform to the additional requirements in
this Slant/Fin Instruction Book.
In addition, where required by the authority having jurisdiction,
the installation must conform to American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices for
Automatically Fired Boilers, No. CSD-1.
This manual must be left with owner and should be hung on or
adjacent to the boiler for reference.
WARNING
This boiler, gas piping and accessories must be installed, con-
nected, serviced and repaired by a trained, experienced service
technician, familiar with all precautions required for gas fired
equipment and licensed or otherwise qualified, in compliance
with the authority having jurisdiction.
Boiler Model Number
Boiler Serial Number
Installation Date
CANADIAN ENERGY
PERFORMANCE
AND L.P. PROPANE GASES
PUBLICATION GG-40S
VERIFIED
RENDEMENT
ENERGETIQUE
VERIFIE