Operation Procedure; Operation Procedure Flow Chart - Daikin LXE10E-A11 Manual

Marine type container refrigeration unit
Table of Contents

Advertisement

Available languages

Available languages

https://daikin-p.ru

2. OPERATION PROCEDURE

2.1 Operation procedure flow chart

S
When no power supply
Power OFF
Non operation for 30 sec.
Circuit Breaker ON
Unit OFF
I/O ON
All indication
light on
(for 3 sec.)
for 3 sec.
※ 3.9.2.1
F. PTI
Starting
S. PTI
preparation
M. CHECK
(for 18 sec.)
S
※2 Operation Setting (Set Point Temperature˚C, Humidity %, Defrost Internal)
※ 1
Current
indication
or non operation for 5 min.
(Operation state)
or non operation for 5 min.
MODE
M
CHART
CHART
※14  Logging data can be down loaded even when the power supply OFF, the unit OFF
I/O Unit On / Off key
Enter key
CHART
※ 3
I/O OFF
for 3 sec.
※ 10
Optional
Function
Setting
※6 Sensor Indication
※G-SET operation
 (The energy consumption
  reducing operation)
※ 3.10.1 Chart Indication
or the unit in operation.
To down load the data during the power supply OFF, press the
the wake-up battery.
S key
Select key
S
8 / Chart key
Battery mode, Operation Condition Setting with back-up battery
(Set Point Temperature˚C / Humidity %, / Defrost Internal)
Circuit Breaker OFF
after setting change
(
I/O
OFF when no settig change)
for 3 sec.
for 3 sec.
※ 11
Basic
Function
Setting
※ 7 Temperature
Record Scroll
MODE
M
※4 Automatic
   pump down
Difference from standard model
★: Dehumidification control is auailable on A26 and A26A only.
5
for 3 sec.
※ 12
※ 13
Optional
Container
Condition
I.D & Time
Setting
Setting
※ 8 Alarm
Record Scroll
MODE
M
※4 Dehumidification
   ON-A・OFF setting
MODE
M
S
key for using

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lxe10e-a20Lxe10e-a26Lxe10e-a26a

Table of Contents