4.2
Preparations for mounting
Requirements
• Follow the national legal requirements for the mounting and electrical installation.
• Installation site:
– The wall is even and load-bearing
– When mounting on a column or anywhere else, observe the applicable installation and
• Connection to the power supply is ready.
• All power supply connections are de-energized and secured against unintentional
reconnection.
Required tools
The required tools are not included in the scope of delivery.
• SW 36 open-ended wrench
• Optional cable gland
• Phillips head screwdriver set
• Slotted screwdriver set
• Torx TR screwdriver set
• Tool set for electricians
• Spirit level
• If applicable, crimping tool and installation tool for RJ45 plug
Tools for stone wall or concrete wall:
• Impact drill
• Masonry drill ∅ 8 mm
• Hammer
VersiCharge AC Wallbox IEC
Operating Instructions, 12/2021, A5E50366109-AA
mounting information.
Mounting / Installing / Connecting
4.2 Preparations for mounting
23