3.13 Initial NURO Control Setup and Adjustment

This manual covers basic NURO control setup and adjustment. For a walkthrough of the complete
control setup, please refer to the NURO Boiler Controller: Advanced User's Guide, Part Number is
1004905979 which is helpful for more complex installations. For more complex boiler or water heater
applications and more information on the parameters, please refer to the NURO Advanced User's
Guide.

Startup

When the boiler or water heater is powered on, the NURO touchscreen will display an initial Startup
Screen then the Local Representative screen. This shows the name, address and phone number of
the local Patterson Kelley representative.
Revised: December 8, 2021
Released: December 8, 2021
 Patterson-Kelley 2021
All Rights Reserved.
TM
P-K Storm
Gas Fired Boiler
Technical Service 1.877.728.5351
2691000273 P-K Storm ST2500-ST6000
Installation and Owners Manual Rev C.docx