1
Initial situation
3
➭
Switch the left-hand three-position disconnector to OPEN position
(insert the operating lever for the DISCONNECTING function and turn
180° counter-clockwise).
5
➭
Push the right-hand control gate to the right.
7
➭
Remove the operating lever for the READY-TO-EARTH function.
The right-hand control gate returns to its initial position.
861-9601.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • Revision 11
De-earthing busbar section 1
2
➭
Push the left-hand control gate to the left.
4
➭
Remove the operating lever for the DISCONNECTING function.
The left-hand control gate returns to its initial position.
6
➭
Switch the right-hand three-position disconnector from EARTHED to
OPEN position (insert the operating lever for the READY-TO-EARTH
function and turn 180° counter-clockwise).
Operation
179/214