Installation
Setting down the
transport units from the
long side of the floor
opening
58/214
The transport units are set down in front of the long side of the floor opening to the cable
basement, and are pushed over the floor opening.
Precondition: The transport units must be standing on the roller pads / tubes without pallet.
➭ Roll the first transport unit up to the final position in parallel to the floor opening.
➭ Lift the transport unit.
➭ Remove the roller pads / tubes from underneath the transport unit.
➭ To shift the transport unit more easily and to protect the floor, shims can be laid under as
a sliding aid.
➭ Set down the transport unit carefully.
➭ Shift the transport unit with hydraulic jacks, lifting equipment or lifting jacks until it is
exactly aligned on its place of installation. Prop the hydraulic equipment or jacks up at the
surrounding walls.
➭ If the transport unit is partly or totally standing on the sliding aids, lift the transport unit,
remove the sliding aids and carefully set down the transport unit again.
➭ Roll the next transport unit in front of the floor opening, and place it beside the first
transport unit at a distance of 500 mm.
➭ Lift the transport unit.
➭ Remove the roller pads / tubes from underneath the transport unit and lay sliding aids
under, if required.
➭ Set down the transport unit carefully and push it over the floor opening.
➭ Align the transport unit roughly, keeping a distance of 500 mmas a minimum.
➭ Remove the sliding aids from underneath the transport unit as described above.
➭ Proceed in the same way with all other transport units.
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
Transport unit
Floor opening
Door to the switchgear room

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents