Chapter 4: Preinstallation Checklist - Extreme Networks ExtremeSwitching Virtual Services Platform 4450GSX-PWR+ Installation Manual

Hide thumbs Also See for ExtremeSwitching Virtual Services Platform 4450GSX-PWR+:
Table of Contents

Advertisement

Chapter 4: Preinstallation checklist

Before you install the VSP 4450GSX-PWR+and VSP 4450GSX-DC, make sure that you complete
the tasks in the preinstallation checklist.
No.
Task
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
2.
Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
3.
Make sure that you have the following
tools and cables:
• Phillips #2 screwdriver
• RJ45 console port cable
• ESD cable
4.
Unpack the equipment.
5.
Verify the contents of the shipped
package.
6.
Make sure that the power cord has the
correct country-specific termination.
7.
Prepare the rack.
August 2018
Description
For the physical, electrical, and environmental
specifications, see
page 19.
See
PWR
specifications
To order redundant PSUs, see
models
See
page 24.
Observe ESD precautions when you unpack
the equipment. See
page 18.
See
description of the components that are
provided with the switch. If any components
are missing, contact Extreme Networks
support.
Ensure that there is enough rack space to
accommodate a 2RU switch (8.8 cm).
Ensure that the rack is bolted to the floor and
braced if necessary.
Installing the Virtual Services Platform 4450GSX-PWR+
Technical specifications
Power specifications for VSP 4450GSX
on page 30 or
DC power supply
on page 30.
on page 10 for part numbers.
Cable requirements for the VSP 4000
Electrostatic discharge
Package contents
on page 21 for a
on
Hardware
on
on
Table continues...
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents