Maintenance Screens - Graco HydroShield WMBL00 Instructions - Parts Manual

Air spray batch waterborne waterborne isolation systems
Table of Contents

Advertisement

Setup Menus

Maintenance Screens

Screens
Maintenance
Maintenance
Screens
Maintenance
Maintenance
Maintenance 1: 1: 1: Maintenance
Maintenance
Maintenance Due
Use the Maintenance Due screen to set maintenance
reminders for system components. When the cycle
counters for each item reach these set values, an
advisory is displayed on the screen.
Isolation Valve:
Valve: The number of times the isolation
Isolation
Isolation
Valve:
valve shuttle has moved.
Isolation Valve
Valve Seal:
Seal: The number of times the seals
Isolation
Isolation
Valve
Seal:
in the housing have been engaged.
Wash
Wash Fluid:
Wash
Fluid: The number of times the wash fluid has
Fluid:
been moved through the isolation valve.
Volume:
Volume: The total volume (cc) of fluid dispensed
Volume:
by the isolation fluid pump between maintenance
events. This value does not account for material that
is pushed through the system in Prime mode.
Pump:
Pump: The number of times the isolation fluid pump
Pump:
has dispensed fluid.
Pump: The number of days that have passed since
Pump:
Pump:
the last stall test was completed successfully. See
Pump Stall Test Procedure, page
Solenoid
Solenoid
Solenoid Valve:
Valve: The number of times the
Valve:
solenoid valves have been activated. (All of the
solenoids listed in Status screens 1 and 2. See
Status Screens, page
50.)
60
Due
Due
Maintenance 2: 2: 2: Pump
Maintenance
Use the Pump Stall Test screen to test the isolation
fluid pump for internal and external fluid leaks. During
the Pump Stall Test, the pump position is held for 60
seconds while the system looks for leaks.
61.
Maintenance
Pump Stall
Pump
Stall Test
Stall
Test
Test
3A7312D