Safety Measures (See Section 3); Tools And Spare Parts Supplied With Machine; Inspections To Be Performed Before And After Every Maintenance Operation; Drive Belt Replacement - 3M 40800 Instructions And Parts List

Random case sealer with accuglide 3 taping heads
Hide thumbs Also See for 40800:
Table of Contents

Advertisement

13-MAINTENANCE AND REPAIRS

13.1 Safety Measures (see section 3)

Carrying out maintenance and repairs may imply
the necessity to work in dangerous situations.
13.3 Recommended Frequency of Inspection and Maintenance Operations
Operation
Inspection safety features
Cleaning of machine
Cleaning of cutter blade
Oiling of felt pad
Lubrication
Blade replacement

Drive belt replacement

13.4 Inspections to be Performed Before and
After Every Maintenance Operation
Before every maintenance operation, turn the main
switch OFF and disconnect. During the maintenance
operation, only properly trained and qualifi ed person-
nel must work on the machine. At the end of every
maintenance operation check the safety devices.
13.5 Check Effi ciency of Safety Features
1. Blade guard assembly upper taping head
2. Blade guard assembly lower taping head
3. Latching Emergency stop button with mechanical
lock (interrupt supply of electrical power)
4. Turn the main switch STOP/OFF
5. Safety guards top drive belts
13.6 Cleaning of Machine
Qualifi cation 1
A weekly cleaning with dry rags or diluted detergents
is necessary. Cardboard boxes produce a signifi cant
quantity of dust and paper chips when processed
or handled in case sealing equipment. If this dust is
allowed to build up on machine components, it can
cause component wear and over-heating of drive
motors. The dust build up is best removed from the
machine with a vacuum cleaner. Depending on the
number of cartons processed, this cleaning should
be done weekly. Excessive build-up that cannot be
removed by vacuuming should be removed with a
damp cloth.
700rks-NA
Frequency
daily
weekly
weekly
weekly
monthly
when worn
when worn
42
13.2 Tools and Spare Parts Supplied with
the Machine
See Spare Parts Order Section.
Qualifi cation
1
1
2
2
2
2
2
13.7 Cleaning of Cutter Blade
Qualifi cation 2
Should tape adhesive build-up occur, carefully wipe
clean with oily cloth or brush (Figure 13-1). Oil pre-
vents the build-up of tape adhesive.
(See manual 2.)
To reduce the risk associated with
mechanical and electrical hazards:
− Read, understand, and follow all safety
and operating instructions before operating
or servicing the case sealer.
− Allow only properly trained and qualifi ed
personnel to operate and service this
equipment.
To reduce the risk associated with
pinches, entanglement and hazardous
voltage:
− Turn electrical supply off and disconnect
before performing any adjustments,
maintenance or servicing the machine or
taping heads.
Sections
13.4
13.5
13.6
13.7
13.7-13.8
See Manual 2
13.10
WARNING
2010 January

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3m-matic 700rks

Table of Contents