Set-Up Instructions - Woods CZR2242B Parts & Operators Manual

22hp/26hp b&s w/42”/ w/52” side discharge
Table of Contents

Advertisement

SET UP INSTRUCTIONS
TOOLS REQUIRED FOR ASSEMBLY
-
Wrecking bar
-
Claw hammer
-
Sockets: 1/2", 15/16
-
Wrenches: 18mm, 1/2", 9/16", 3/4", 15/16"
-
Tire pressure gauge
NOTE: All references below to the "right" or "left" are with respect to an operator at the controls.
1. UNCRATE UNIT
a) Discard packing materials. Loosen the caster wheel axle bolts and bumper bolts to remove the shipping
brackets.
Discard shipping brackets.
b) Re-install and tighten bumper bolts.
c) Tighten caster wheel axle bolts against caster axle spanner bushings to 80 ft/lbs.
2. TIRE PRESSURE
a) Set tire pressures to 14 lbs/in
3. TRACTION LEVERS
a) Tighten bolt A.
b) Sit on the machine. Levers C may be moved to
upper set of holes in bar B for a better operator
fit.
12
). Tires are overinflated for shipping.
2
(1.0 kg/cm
2
WOODS

Advertisement

Table of Contents
loading

This manual is also suitable for:

Czr2652b872311g872313g

Table of Contents