Installing The Burner; Checking The Neutralising System (If Installed); Checking The Anode Connection - Viessmann Vitodens 222-F Installation Instructions For Contractors

Gas condensing storage combi boiler natural gas and lpg version
Table of Contents

Advertisement

Installing the burner

4x
G
C
E
D
B
Fig. 30
1. Insert the burner and tighten screws
Torque: 8.5 Nm
2. Fit gas supply pipe
F
Torque: 30 Nm
3. Check the gas connections for tightness.
Danger
Escaping gas leads to a risk of explosion.
Check the fitting for gas tightness.

Checking the neutralising system (if installed)

Checking the anode connection

Check that the earth cable is connected to the magne-
sium anode.
F
A
G
diagonally.
with a new gasket.
Commissioning, inspection, maintenance
4. Connect the electrical cables/leads:
Fan motor
A
Ionisation electrode
Gas train
B
Ignition unit
D
Earth
E
5. Remount the cover panel.
C
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2sb

Table of Contents