Viessmann Vitopend 100-W Installation And Service Instructions For Contractors page 21

Gas system and combi boilers for open flue operation natural gas and lpg version
Table of Contents

Advertisement

Further details regarding the individual steps
4. Check the static pressure and record
it in the "Reports" table.
Set value: max. 57.5 mbar
(5.75 kPa)
5. Start the boiler.
Note
During commissioning, the boiler can
enter a fault state because of airlocks
in the gas line.
To reset, turn off the ON/OFF switch
on the control unit and turn it on again
after approx. 3 s. The ignition process
will then repeat.
6. Check the supply (flow) pressure.
Set value:
■ Natural gas: 20/25 mbar
(2.0/2.5 kPa)
■ LPG: 28/30/37/50 mbar
(2.8/3.0/3.7/5.0 kPa)
Note
Use a suitable measuring instrument
with a resolution of at least 0.1 mbar
(0.01 kPa) to check the supply pres-
sure.
Commissioning, inspection, maintenance
(cont.)
7. Record the actual value in the
"Reports" table.
Take action as shown in the following
table.
8. Turn off the ON/OFF switch on the
control unit (the boiler shuts down).
Close the gas shut-off valve, remove
the pressure gauge and close test
connector A with the screw.
9. Open the gas shut-off valve and start
the appliance.
Danger
Gas escaping from the test
connector leads to a risk of
explosion.
Check the test connector for
gas tightness.
21