Siting
(cont.)
Power supply 400 V/50 Hz
E
Low voltage < 50 V
F
Power supply 230 V/50 Hz
G
Note
Observe the separately supplied dimensions for pipe
knock-outs.
Hydraulic connection requirements
■
Install hydraulic connections on site stress-free.
■
Make the hydraulic connections between several
heat pumps on site.
All components required for the cooling circuit must
■
be provided on site. This must be achieved with an
appropriately sized plate heat exchanger.
Primary circuit: brine/water, 1-stage
Type BW 301B.090, BW 301.B120
Hydraulic installation scheme
20
22
15
27
Fig.13
21
--2/LP1 X3.8;3.9--
1
2
Preparing for installation
17