84.8 to 222.0 kw brine/water heat pumps, 2-stage
Table of Contents

Advertisement

Preparing for installation
Requirements for on-site connections
Dimensions, type BW 302.D230
176
368
367
Fig. 10
Primary circuit flow (inlet):
A
Victaulic 3
(DN 80)
"
Secondary circuit flow (outlet):
B
Victaulic 2
(DN 65)
½"
Primary circuit return (outlet):
C
Victaulic 3
(DN 80)
"
Note
The width of the heat pump is given with and without
side panels. The dimensions without side panels are
the transport dimensions for handling.

Hydraulic connection requirements

Make on-site hydraulic connections stress-free.
Make the hydraulic connections between several
heat pumps on site.
All components required for the cooling circuit must
be provided on site. This must be achieved with an
appropriately sized plate heat exchanger.
16
(cont.)
1972
Secondary circuit return (inlet):
D
Victaulic 2
½"
Low voltage < 50 V
E
Power supply 230 V/50 Hz
F
G
Power supply 400 V/50 Hz
(DN 65)