Download Print this page

Arrow Storage Products ED65SB Owner's Manual & Assembly Instructions page 24

Advertisement

Step 11
BH24
1
Cover the joint at the peak with
weather stripping tape. Unroll the
tape and press it down over the
opening at the ridge as you install
each roof panel. Do not cut the tape
at this time.
2
Install a left and right roof panel
in the sequence and positions shown
in Step 9. Follow fastener sequence
and instructions in Steps 9 thru 11
while fastening roof panels. Fasten
overlap at center of roof panel rib
using a bolt and nut.
NOTE
Narrow roof panel rib (with bead
on it) is always overlapped by
wide rib of adjacent panel
3
Unroll the weather stripping tape,
press it down rmly, and cut it.
4
Fasten the lower end of the panels
to the side wall angles using screws
and washers.
6442 Right Roof Panel
Cut
Weather Stripping
and Fold Under
STEP
3
Parts Needed For
Front of Roof
If roof beam holes do not line up
with the roof panel holes, shift the
building from left to right.
If this does not help, your building
may not be level. Shim the
corners until holes line up.
STEP
Weather Stripping
Tape Roll
24
6443 Left Roof Panel (1)
6442 Right Roof Panel (1)
NOTE
1
Fasten Overlap
at Center of
Panel Only!
STEP
6443 Left Roof Panel
STEP
2
4

Advertisement

loading

This manual is also suitable for:

Ed65Wr65Ed65bsWr65euEd65lgGd65 b ... Show all