The production of the water-cooled water chiller unit shall strictly follow the design and production standards to
ensure that the unit provides high-quality operation, high reliability and excellent adaptability.
This manual contains the information necessary for proper installation, commissioning, start-up and maintenance.
For the best use of this equipment, please read this manual and various labels posted on units and components carefully
before installing, starting or overhauling the machine.
Do not operate the machine if you do not fully understand the working principle of the unit, or don't have sufficient
safety knowledge, and fail to take the relevant safety protection measures, so as to avoid personal danger and unit failure.
Therefore, we recommend that the installation and commissioning of the machine should be done by specially
trained personnel.
The installation must be carried out by trained professionals.
The start-up of the machine must be carried out by professional maintenance personnel of the professional York
Company Maintenance Service Center or designated special company personnel.
Only use the various spare parts provided by York Company.
All machine operation and maintenance items specified in this manual must be carried out in strict accordance with
the specified time and frequency.
The warranty shall automatically become invalid in case of violation of any of the above conditions.
The personnel responsible for the installation of the machine shall ensure the installation process is carried out
safely and he/she shall also be responsible for the installation of all refrigerant pipelines, conduits, electrical installations
and other necessary ancillary equipment.
York Company shall not be liable for any personal injury or machine damage caused by improper installation
and commissioning, unnecessary maintenance, or non-compliance with the provisions and instructions in this
manual.
Should you have any questions during the installation, please contact York Company and its various local offices.
Other Precautions
Inspection
Upon the receipt of the unit, it shall be inspected immediately for the damage that may occur during
transportation. If there is any obvious damage, it shall be written on the carrier's transport documents, and then
claim according to the instructions of the notice. In case of damage of any parts other than the surface, please
inform the maintenance personnel of the local York Company immediately.
Storage
If the unit is to be stored for a period of time before installation, some protective measures shall be taken to
The temperature of storage environment shall not exceed the range of -30 ~ 48 ℃, and the relative humidity
prevent damage, corrosion or wear.
All joints such as water pipe joints shall be sealed in good condition.
shall be less than 90%. The direct sunlight shall be avoided.
Do not use hot water or steam to clean it for fear of inadvertently actuating the safety mechanism of the unit.
In order to reduce the possibility of accidental damage (such as being broken and collided, etc.), the unit
should be stored as much as possible at the place at which various activities are least likely to happen.
Take the key of the electric control cabinet down and keep it properly.
Periodic visual inspection shall be conducted during the storage.
Symbols Used in This Manual
!
Warning: The warning must be observed to avoid physical injury to the user
!
Caution
This attention must be followed in order not to cause damage to the machine parts
:
Cooke Industries - Phone: +64 9 579 2185
Foreword
The warranty coverage must meet the following conditions: