Curtis G3 D500 Series User Manual page 8

Airpot coffee brewing system
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Installation
Leveling
WARNING: Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
1
Position the brewer on the counter top. Level it left to
right and front to back by turning the bottom of the
Connecting the Water Supply
2
Flush the water supply line prior to installation to
3
the water supply valve closed until the power is
connected.
Setting Up Dual Voltage Units for 220-240 Volt
Operation (CBHS, D500GT[H]63, D1000GH62 and
D1000GT63 Series Models)
WARNING: Do not connect the power cord to the
power supply until instructed to do so.
4
Remove the front cover by removing the screws that
hold it in place.
5
Loosen the strain relief on the back of the brewer.
6
Disconnect the existing power cable from the terminal
block and remove it.
7
Disconnect and cap the jumper wire between the "C"
and "N" terminals on the terminal block.
8
Feed the 220-240 Volt power cable through the strain
relief, into the brewer. The brewer may be wired for
connection directly to a junction box or for use with
a power plug that connects to an electrical outlet
meeting the brewer SPECIFICATIONS.
9
Connect the wires on the power cable to the
terminal block inside the brewer according to the
ELECTRICAL SCHEMATIC.
10 Tighten the strain relief.
11 Replace the front cover.
DECANTER/DISPENSER BREWERS, INSTALLATION INSTRUCTIONS - 200F
Front
panel
Terminal
block
II35
or
080519A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents