Curtis G3 D500 Series User Manual page 11

Airpot coffee brewing system
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Powering Up the Brewer (cont.)
24 When the water in the tank rises to the correct level, the
heating elements will turn on automatically. Depending
on the incoming water temperature and the electrical
minutes to reach the factory set operating temperature.
When the water has heated, Ready to brew will be
displayed on the LCD screen.
IMPORTANT: When operating the brewer at
higher elevations, reduce the factory set operating
1000 ft./300 m of elevation above 4000 ft./1200 m.
See the PROGRAMMING GUIDE section.
25 Perform a brew cycle of a least 12 oz./350 ml to purge
any remaining air from the system. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
water tank.
26
coffee cup with hot water to purge air from the hot
water line.
DECANTER/DISPENSER BREWERS, INSTALLATION INSTRUCTIONS - 200F
II35
080519A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents