Step 7: Check The Installation; Step 8: Apply Power And Check The Leds - NETGEAR GC752XP Hardware Installation Manual

Insight managed 28-port and 52-port gigabit ethernet smart cloud switch with 2 sfp 1g & 2 sfp+ 10g fiber ports (and poe on gc728xp and gc752xp only)
Table of Contents

Advertisement

Insight Managed 28-Port and 52-Port Gigabit Ethernet (PoE+) Smart Cloud Switch
2. Verify that all cables are installed correctly.

Step 7: Check the Installation

Before you apply power to the switch, perform the following steps.
To check the installation:
1. Inspect the equipment thoroughly.
2. Verify that all cables are installed correctly.
3. Check cable routing to make sure that cables are not damaged or creating a safety
hazard.
4. Make sure that all equipment is mounted properly and securely.

Step 8: Apply Power and Check the LEDs

The switch does not provide an on/off power switch. The power cord connection controls
the power.
Before connecting the power cord, select an AC outlet that is not controlled by a wall
switch, which can turn off power to the switch.
To apply power:
1. Connect the end of the power cord to the AC power receptacle on the back of the
switch.
2. Plug the AC power cord into a power source such as a wall socket or power strip.
3. Check to see that the LEDs on the switch light correctly.
When you apply power, the Power LED on the switch front panel lights and the port
LEDs for attached devices light.
Note: After you apply power, the Power LED lights solid amber while the switch
starts. After two or three minutes, the switch completes its startup process and the
Power LED turns from amber to solid green.
If the Power LED does not light, check to see that the power cord is plugged in
correctly and that the power source is good.
Installation
29
Hardware Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc728xpGc752xGc728x

Table of Contents