CAME OPP Series Installation, Operation And Maintenance Manual page 30

Gear motor for swing gates
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 18
CONNECTING TWO GEARMOTORS
M1 N1 ENC1
M2 N2 ENC2
CONNECTING ONE GEARMOTOR
M2 N2 ENC2
Gearmotor with encoder (M2) 24 V DC
M
CONNECTION FOR OPENING OUTWARDS
⚠ Establish the quotas A and B.
Cut and fasten post bracket
Open the gate (max 90°), establish the quota E and establish the gate bracket fastening point. Fasten the bracket.
Gearmotor with encoder (M2) 24 V DC, delayed when closing.
M
Gearmotor with encoder (M1) 24 V DC, delayed when opening.
M
by supplementing it with an additional bracket b (not issued).
A
Opening
A
(°)
(mm)
(mm)
90
130
130
B
E
(mm)
740

Advertisement

Table of Contents
loading

Table of Contents