Installation - CAME OPP Series Installation, Operation And Maintenance Manual

Gear motor for swing gates
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 18

INSTALLATION

 The following illustrations are mere examples in that the space for anchoring the operator and accessories
varies depending on the installation area. It is up to the installer to find the most suitable solution.
CORRUGATED TUBE LAYING
Set up the junction boxes and corrugated tubes you will need to make connections coming from the junction pit.
To connect the gearmotor we suggest a Ø 60 mm corrugated tube. Whereas for
the accessories we suggest Ø 25 mm tubes.
 The number of tubes depends on the type of system and the
accessories you are going to fit.
FASTENING THE BRACES
Establish the gate bracket fastening point and find the bracket's fastening point to the post, while respecting
the quotas shown in the drawings and tables.
Opening
(°)
90
115
⚠ The greater the gate leaf's
opening angle, the greater the
opening speed and the slower
is the gearmotor's thrust.
The smaller the gate leaf's
opening angle, the slower the
opening speed and the greater
is the gearmotor's thrust.
A
B
(mm)
130
110
170
-
150
110
160
-
C
0
60
740
-
0
50
740
-
≤60
E
E

Advertisement

Table of Contents
loading

Table of Contents