Installer Checklist - Fisher & Paykel DCS GDSBE1-30 Installation Manual

Double side burner/griddle
Table of Contents

Advertisement

IMPORTANT!
Read all installation instructions in this manual to see if the unit has been correctly installed.
Ensure that installation has been completed correctly before use.
Ensure that:
specified clearances are maintained to combustibles
proper enclosure ventilation has been verified
all internal packaging and any adhesive residue is removed
the burner is level and does not rock
dials turn freely, bezels centred
halo lighting is functioning correctly
all warning labels removed and supplied to customer for future reference
Complete and keep for safe reference:
Model
Serial No.
Purchase Date
Purchaser
Dealer Address
Installer's Name
Installer's Signature
Installation Company
Installation Date

INSTALLER CHECKLIST

flame has been adjusted
each burner lights satisfactorily - individually or with adjacent burner lit
the pressure regulator is connected and set for 4.0" W.C. Natural, 11.0" W.C. LP gas
the manual shut-off valve is installed and accessible
the unit has been tested and is free of leaks
the user is informed of gas supply shut-off valve location
14

Advertisement

Table of Contents
loading

Table of Contents