Upload Scheduling Project; App Upgrade - Crestron TSW-570 Series Product Manual

5 in., 7 in., and 10.1 in. wall mount touch screens
Hide thumbs Also See for TSW-570 Series:
Table of Contents

Advertisement

Upload Scheduling Project

Click Upload Scheduling Project to upload a custom scheduling project to the touch screen. A
Project Upload dialog box opens.
Project Upload Dialog Box
NOTE:
This selection is available only if the touch screen is running in Crestron Default scheduling
mode.
To upload a custom scheduling project:
1. Click Browse, and then navigate to the project .vtz file on the host computer.
2. Select the project .vtz file, and then click Open.
3. Click Load to load the project .vtz file to the touch screen. The upload progress is shown in
the dialog box.
4. Once the touch screen has completed the project upload, click OK.
Click the x button to close the Project Upload dialog box at any time during the upgrade process.
Clicking the x button before the project file is uploaded to the touch screen cancels the upload.
App Upgrade
Click App Upgrade to update the currently selected application. The update progress is shown in a
pop-up window.
Once the update is complete, click OK to close the pop-up window.
40 • TSW-570, TSW-770, and TSW-1070
Product Manual — Doc. 8550C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents